September 2009
Wiener Helmet
The helmet for Austrian fire fighters was not easy to form. We had to develop some new ideas.

September 2009
Press Review
The Newspaper DER MONAT published an article about ALU-SPF
Press DER MONAT
Spring 2009
New Process
We had to develop a new process for this part.

Christmas 2008
SPF-Watch
We produced a SPF-Watch for our clients.

Sommer 2008
2D-Waterjet
We build up a new Waterjet for 2-dimensional applications.
July 2007
New staff
Erwin Knünz, welcome to ALU-SPF. He is responible for sales.

July 2007
Catia
Now it's also ours, the world famous CAD-System. We do not need to translate CATIA files any more, now we are able to read them directly..
June 2007
Faster!!!
The famous cable car in Rio gots a renewal. We formed all the body parts within a short timeframe.

May 2007
Fast!!!
The heat shield below was delivered 3 weeks after reception of order!

29.9.2006
Granite
This desgin has benn cutted form two multi colored granites. The sample is symetric and has a joint of 0,1 mm.

7.8.06
A new electronic box
This box consists of two parts, the upper box and a base station. All parts are superplastic formed, trimmed with our waterjet and have an
anodised surface.

30.6.06
There it is!!!!!
After two years designing and working, after several prototypes, there ist is, our new column. Now everybody is able to find us.
The basement is homemade and constructed by ourselves. The letters are cut with our water jet. The inside is made from the professionals from LITEX .

12.6.06
In production we hired a additional employer, Oguz Tutal.
10.4.06
With a high accurancy measurementsystem, two technicians from KUKA inspected our Rob.

1.3.06
First carpets for automototive have been trimmed by our water jet.
1.1.06
Heatshields with embossed surface can be trimmed with almost no burr (EN AW 1050).
24.10.05
We improved our press. All electrical wiring to the heating unit has been redone.
1.9.05
The waterjet unit got a noise absorber. We installed on the wall an accoustic absober.
20.6.05

This aluminium part was formed with an aluminium tool at 500 ° C.
1.6.05
Pascal Hutter joint our team.
13.5.05
Congratulations to Roman Herstelle. He finished his post-graduate Studies as an economical engineer.
1.3.05
Financial departement founded. Christina Ranieri takes care of our books and financials.
1.3.05
Good news. We do not have to clean up our office. We found somebody who takes care of our office. But
we still have to clean the production area by ourselves.
22.10.04, 8:00 Uhr
Where is our phone. We lost our telephone!

10:00 Uhr Phone found! For a short moment, we are not reacheable...
14:00 Uhr We bought a new phone.
1.7.2004

Wiring and heating installed - first parts are produced.
28.6.2004

The Rob is cutting an Aluminium part.

Part number 005!
26.5.2004

The machine gets shape.
26.5.2004

Waterjet is ready for first trials.
19.5.2004

A new Press is growing.
1.4.2004

First parts of equipment arrived.
10.3.2004

The empty building.
1.2.2004
ALU-SPF moved into the building - im alten
Riet 101 - in Schaan.
15.1.2004
ALU-SPF founded and has all the permits to start.